Project:
Extension of existing cascade (water fall) with small power house, 14MW, stand alone.
Salient Features of the Project
Location: Makawanpur District
Type of Scheme: Cascade project of Kulekhani Storage Project
Catchment area: 143 km2
Design Discharge: 16.0 m3/s
Gross Head: 109.80 m
Net Head: 102.56 m
Headworks
Khani Khola Intake: Conventional Side Intake on Stilling Basin D/S of the consolidation Check Dam.
Conveyance Length: 301.58 m
Siphon: Barrel Size 2.7 m x 2.7 m x 74.1 m
HeadPond
Capacity: 1956 m3
Size: 30 m x 10 m x 6 m
Headrace Tunnel
Type : Horse Shoe Shaped, Concrete Lined
Length: 4293 m
Diameter: 3.50 m
Forebay (Underground)
Length: 100 m
Type: Horse Shoe Shaped, Concrete Lined
Width / Height: 6 m/ 6-18 m
Adit Tunnel
Type: Inverted D Shaped
Length: 3 Nos, 692.5m
Diameter: 3.5 m, except Adit 3 (Access Tunnel) 4m
Tunnel Penstock
Length (Inclined):129 m
Length (Horizontal): 257.9 m
Diameter Steel/Tunnel: 2.30 m/3.8 m
Powerhouse
Type: Surface
Dimension: 32.10 m x 21.70 m x 29.24 m
Tailrace
Type: RCC Closed Duct & Open Channel
Length: 76 m RCC Closed Duct, 52 m Open Channel
Size: 3 m x 3.5 m for Closed Duct & Width 10 m for open channel
Power Facilities
Installed Capacity: 14 MW
Annual Energy Generation: 40.85 GWh
Turbine
Type: Vertical Axis Francis Turbine
Nos: 2 (Two)
Generator
Type: 3 Phase, Synchronous AC
Nos: 2 (Two)
Transmission Line
Grid Type: 132 kV Transmission Line
Length: 0.50 km